Kavak – Samsun Railway
It was carried out within the scope of the renewal of the Samsun - Sivas Railway line, which was built and started to be used since the first years of the Republic.
- 60.000 m³
- C 25/30, C 30/37
- ÇELİKLER-GÜLERMAK-AZD İŞ ORTAKLIĞI
- 2017-2020
- KAVAK - SAMSUN
- KAVAK-SAMSUN-MERZİFON-AMASYA TESİSLERİ
BETONSA